Home · The Credit Library · SMA meaning
The Credit Library
SMA in CIBIL: what SMA-0, SMA-1 and SMA-2 mean.
The RBI's early-warning bands for a loan that is overdue but not yet an NPA, where they show up on a report, and what ends them.
Key takeaways
- SMA stands for Special Mention Account: the RBI's label for a loan that is still a standard asset but is showing stress because a payment is overdue.
- For loans other than cash credit and overdraft, SMA-0 means overdue up to 30 days, SMA-1 more than 30 and up to 60 days, and SMA-2 more than 60 and up to 90 days. Beyond 90 days the account becomes an NPA.
- For cash credit and overdraft there is no SMA-0: SMA-1 and SMA-2 count the days the balance stays above the limit or drawing power.
- Banks flag SMA in their day-end process on the due date's count, whatever the size of the loan. A wrongly reported overdue is corrected with the lender, with evidence; an accurate one ends only when the dues are cleared.
The short answer
SMA in CIBIL and in banking means Special Mention Account: a loan that has not yet become a non-performing asset (NPA) but has a payment overdue. The RBI uses three SMA bands to catch stress early, and lenders carry the same classification into the credit information they report. On a company credit report, the outstanding balances are grouped by these bands.
SMA-0, SMA-1 and SMA-2, as the RBI defines them.
For term loans and other loans that are not revolving facilities, the test is whether principal, interest or any other amount is wholly or partly overdue, and for how long:
| Band | Term loans and other non-revolving loans | Cash credit and overdraft |
|---|---|---|
| SMA-0 | Overdue up to 30 days | No SMA-0 band |
| SMA-1 | Overdue more than 30 days and up to 60 days | Balance continuously above the sanctioned limit or drawing power, whichever is lower, for more than 30 and up to 60 days |
| SMA-2 | Overdue more than 60 days and up to 90 days | The same, for more than 60 and up to 90 days |
| NPA | Overdue more than 90 days | Out of order for 90 days |
The RBI says these rules apply to all loans, retail loans included, whatever the size of the exposure. The one exception is agricultural lending classified by crop season.
How the count runs
The day-end rule: why SMA can arrive on the due date itself.
Since the RBI's November 2021 clarification, lenders flag an account as overdue in the day-end process for the due date, and the SMA or NPA classification date is the calendar date for which that day-end process runs. The RBI's own example: an EMI due on 31 March and unpaid is overdue that day, becomes SMA-1 on 30 April, SMA-2 on 30 May and an NPA on 29 June.
Two consequences follow. A payment made a day late is still a payment made overdue, and the count that decides the band starts from the due date, not from a grace period you may assume. And because the bands are continuous, an account moves through them in order unless the overdue is cleared.
Where it shows
Where SMA shows up: CIBIL, the CMR, and the RBI's own database.
On a CIBIL company credit report, the outstanding balances are grouped by credit facility and asset classification, in buckets from 0 days past due through 1–30 DPD (SMA-0), 31–60 DPD (SMA-1) and 61–90 DPD (SMA-2) to 91–180 and more than 180 days. CIBIL marks an account as delinquent from SMA-0 onwards. These are the same signals that weigh on a company's CIBIL MSME Rank.
On an individual's report, the same classification appears in the asset classification field alongside STD, SUB, DBT and LSS, and the month-by-month days past due grid shows how long each payment was late. The glossary explains each code.
Separately, banks report SMA classifications to the RBI's Central Repository of Information on Large Credits (CRILC) every month for borrowers with an aggregate exposure of ₹5 crore and above. CRILC is the RBI's supervisory database, not a credit bureau, and you cannot pull a CRILC report the way you pull a CIBIL report.
What ends it
What moves an account out of SMA.
SMA is measured in days overdue, so clearing the overdue amount ends the count. The months that were reported late stay in the payment history as they were reported, and they age; they are not erased by paying.
What the word overdue itself means, and the two fixes for a real and a wrong one, are in overdue meaning in CIBIL. Once an account crosses into NPA, the bar is higher; what NPA means, its three stages and the way back are in NPA meaning in banking. The RBI allows it to be upgraded to a standard asset only when the entire arrears of interest and principal are paid, and where a borrower has several facilities with the same bank, only when the arrears on all of them are paid. Restructured accounts follow their own rules.
The other route is correction. An SMA flag, a DPD figure or a delinquent mark that is wrong, because the payment was made, the limit was enhanced, or the facility was closed, is a reporting error, and it is corrected through the lender with evidence. In a documented Tamil Nadu case, wrongly reported DPDs were corrected after two escalations and the company's CIBIL Rank moved from 7 to 3. What cannot be done, by us or by anyone, is to remove an SMA or DPD history that is accurate.
If the wrong entries are on a company report, the CMR rank improvement page explains how we work; the commercial credit report guide explains the report itself.
Documented cases
Documented on this topic.
Real cases from our files, published with the clients’ consent. Every case depends on its facts; none is a promise of the same result.
- They offered to fix the record if the complaint was withdrawn — Wrongly reported DPDs, rejected disputes, two PMO escalations: CIBIL Rank 7 to 3.
- Three delinquencies, two banks — one corrected rank — Two accounts wrongly marked delinquent and a cleared account never updated: rank 9 to 5 in 15 days.
Sources & regulation
Where these claims come from.
| Claim in this guide | Source |
|---|---|
| SMA-0, SMA-1 and SMA-2 for non-revolving loans; SMA-1 and SMA-2 for cash credit and overdraft; applicability to all loans; CRILC reporting at ₹5 crore and above | RBI (Commercial Banks – Resolution of Stressed Assets) Directions, 2025, paras 15–18 (version of 1 July 2026), read 24 October 2026 |
| Day-end flagging and the classification date; the worked example from 31 March | RBI circular of 12 November 2021 on asset classification (DOR.STR.REC.68/21.04.048/2021-22) |
| NPA at more than 90 days overdue; out of order for cash credit and overdraft; upgrade only on payment of the entire arrears, across all facilities | RBI (Commercial Banks – Income Recognition, Asset Classification and Provisioning) Directions, 2025, read 24 October 2026 |
| CRILC is the RBI's monthly return on large credits | RBI — CRILC return |
| SMA buckets on the CIBIL company credit report; delinquent from SMA-0 onwards | CIBIL — How to read your Company Credit Report (archived copy of 9 April 2025) |
Quick answers
Answered first.
What is SMA in CIBIL?
+
What is SMA in banking?
+
What is the full form of SMA in banking?
+
What is the difference between SMA-1 and SMA-2?
+
Is there SMA-0 for cash credit or overdraft?
+
How do I remove SMA status from my account?
+
An SMA flag your accounts do not explain?
One free read of the company report tells you whether the overdue is real, wrongly reported, or already cleared and never updated.
080 6824 8827 or WhatsApp us — replies in minutes